![]() The new airport was designed and built with several goals in mind, such as to build an airport that provides a flexible, right-sized design for the future that is more efficient and sustainable while maintaining competitive costs. The following aspects of the New SLC project and the SLCDA sustainability programme highlight mileposts on the roadway to net zero. It represents 100 years of progress and serves as a physical manifestation of the SLCDA core values, including the unwavering commitment to protecting the environment and helping the surrounding communities thrive. ![]() The new SLC is so much more than just a new terminal. In the fall of 2020, the SLCDA opened the initial phase of the new Salt Lake City International Airport (SLC), the first new large-hub airport to be built in the U.S. ![]() During the last three years, it is the sustainability ethos and commitment to community that has made the SLCDA stronger, and the airport remains steadfastly optimistic about the future. The principles of sustainability not only helped guide the Salt Lake City Department of Airports (SLCDA) through these challenges but were magnified. On September 15 2020, the doors opened to Phase One of the new SLC Airport, including a new terminal, concourses, parking structure, rental car facilities and concessions.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |